QTS San Antonio
QTS San Antonio is an operational data center operated by Quality Technology Services in Leon Valley, United States. Our footprint estimate of its power is about 15 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Quality Technology Services |
| Facility power | 15 MW (range 6.1 MW to 38 MW) Estimate from building footprint, low confidence. Footprint estimate: about 127,563 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 6,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | QTS San Antonio II |
| Coordinates | 29.44938, -98.65278 |
Power and grid
| Nearest high-voltage substation | Potranco Substation, 138 kV, 600 m away (CPS Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Cagnon Road Substation, 345 kV, 7.3 km away |
| HV substations within 10 km | 20 |
| Utility | City Of San Antonio (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 700 m away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 5.2 GW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does QTS San Antonio use?
We estimate the facility power at about 15 MW. Estimate from building footprint, low confidence.
How close is QTS San Antonio to the power grid?
The nearest high-voltage substation in OpenStreetMap is Potranco Substation (138 kV), about 600 m away. The local utility is City Of San Antonio, in the ERCO balancing area.
How clean is the power for QTS San Antonio?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates QTS San Antonio?
Quality Technology Services.
Data centers near Leon Valley
- Data center in Leon Valley 983 m · 7.2 MW
- Texas Cryptologic Center 1.2 km · 4.7 MW
- Data center in Leon Valley 1.3 km · 16 MW
- Stream Data Centers - San Antonio II 3.1 km · 18 MW
- CyrusOne San Antonio II 3.1 km · 19 MW
- Microsoft SAT14 3.8 km · 66 MW
- CyrusOne San Antonio 3.9 km · 4.7 MW
- Microsoft SAT14 4.0 km · 18 MW
More Quality Technology Services data centers
- QTS Richmond 1 United States
- QTS Piscataway Data Center United States
- QTS Richmond 2 Data Center United States
- QTS Richmond 3 Data Center United States
- QTS Ashburn 1 DC1 United States
- DC5 United States
- QTS United States
- QTS Ashburn-Shellhorn United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.