Microsoft SAT40
Microsoft SAT40 is an operational AI data center operated by Microsoft in San Antonio, United States. Its power is about 106 MW. Epoch AI estimates about 65,000 H100-equivalent AI chips (H100, B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| Facility power | 106 MW Reported (Epoch AI or owner data) |
| IT power | 75 MW |
| AI compute | 65,000 H100-equivalents |
| AI chips | H100, B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 42,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 2.8 billion Epoch AI estimate, 2025 USD. |
| Address | 15000 Lambda Drive, San Antonio, TX 78245 |
| Coordinates | 29.42460, -98.49514 (city level) |
Power and grid
| Utility | City Of San Antonio (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | ERCO |
| Nearest gas pipeline | El Paso Texas Pipeline Co, intrastate pipeline, 11.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.5 °C (2001 to 2025) |
| Cooling degree days | 1,804 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.84 kWh per m² per day |
| Wind at 50 m | 6.1 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2018-12-28 | 0 | 0 | Land clearing begins for the site, specifically digging up a parking lot and making outlines for the buildings. Evident on [Google Earth](https://earth.google.com/web/@29.4149522,-98.80304495,292.48816289a,1532.49619452d,35y,0h,0t,0r/). |
| 2024-05-24 | 66 MW | 32,000 | Building 1 operational. Estimated 3 months out from February, when there was still construction equipment. |
| 2025-12-01 | 106 MW | 65,000 | Building 2 operational. No more construction on building, and surrounding roads are also complete. |
| 2026-02-04 | 106 MW | 65,000 | Site has already been completed, with no more visible construction on any building. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2024-05-24 | H100 | 32,407 | Estimate |
| 2025-12-01 | B300 | 12,750 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft SAT40 use?
Public data puts the facility power at about 106 MW. Reported (Epoch AI or owner data).
What chips does Microsoft SAT40 use?
Reported chips: H100, B300.
How clean is the power for Microsoft SAT40?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Microsoft SAT40?
Microsoft.
Data centers near San Antonio
- Foremost San Antonio 926 m
- H5 Data Centers San Antonio 967 m · 3.5 MW
- Lumen San Antonio 2 1.9 km · 1.3 MW
- Lumen San Antonio 1 11.6 km
- Data center in Leon Valley 14.2 km · 16 MW
- Texas Cryptologic Center 14.3 km · 4.7 MW
- Data center in Leon Valley 14.6 km · 7.2 MW
- QTS San Antonio 15.5 km · 15 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.