Google Data Center, Elmina Business Park 1A

Google Data Center, Elmina Business Park 1A is an operational data center in Kampung Setia, Malaysia. Our footprint estimate of its power is about 22 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).

Key facts

StatusOperational
Facility power22 MW (range 8.8 MW to 55 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 182,984 m² site outline x 0.12 kW per m² of land.
AI chipsGoogle TPU (plus NVIDIA GPUs for cloud customers)
Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips.
GPU capacity if all AIabout 9,400 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates3.22303, 101.51854

Power and grid

Nearest high-voltage substationPencawang Masuk Utama Elmina West 275/132/33 kV, 275 kV, 4 km away (Tenaga Nasional)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km4
Power plants within 50 km4.8 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.2 °C (2001 to 2025)
Cooling degree days3,495 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.8 kWh per m² per day
Wind at 50 m3.1 m/s average
Water stress todayLow (<10%) (Selangor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Google Data Center, Elmina Business Park 1A use?

We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.

What chips does Google Data Center, Elmina Business Park 1A use?

No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).

How close is Google Data Center, Elmina Business Park 1A to the power grid?

The nearest high-voltage substation in OpenStreetMap is Pencawang Masuk Utama Elmina West 275/132/33 kV (275 kV), about 4 km away.

How clean is the power for Google Data Center, Elmina Business Park 1A?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.