Google Data Center, Elmina Business Park 1A
Google Data Center, Elmina Business Park 1A is an operational data center in Kampung Setia, Malaysia. Our footprint estimate of its power is about 22 MW. Likely chips: Google TPU (plus NVIDIA GPUs for cloud customers) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 22 MW (range 8.8 MW to 55 MW) Estimate from building footprint, low confidence. Footprint estimate: about 182,984 m² site outline x 0.12 kW per m² of land. |
| AI chips | Google TPU (plus NVIDIA GPUs for cloud customers) Guess from the operator, not confirmed. Google runs most of its AI work on its own TPU chips. |
| GPU capacity if all AI | about 9,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 3.22303, 101.51854 |
Power and grid
| Nearest high-voltage substation | Pencawang Masuk Utama Elmina West 275/132/33 kV, 275 kV, 4 km away (Tenaga Nasional) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 4.8 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 3,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Selangor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Google Data Center, Elmina Business Park 1A use?
We estimate the facility power at about 22 MW. Estimate from building footprint, low confidence.
What chips does Google Data Center, Elmina Business Park 1A use?
No chips are reported. Based on the operator, the likely chips are Google TPU (plus NVIDIA GPUs for cloud customers).
How close is Google Data Center, Elmina Business Park 1A to the power grid?
The nearest high-voltage substation in OpenStreetMap is Pencawang Masuk Utama Elmina West 275/132/33 kV (275 kV), about 4 km away.
How clean is the power for Google Data Center, Elmina Business Park 1A?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Data centers near Kampung Setia
- TM ONE, Plaza VADS 15.5 km
- Basis Bay 16.2 km
- SAFEHOUSE Data Centre 16.2 km
- NEXTDC Kuala Lumpur Data Centre (KL1) 18.8 km · 6.5 MW
- Alibaba Cloud in Malaysia 21.1 km
- AIMS Kuala Lumpur 22.4 km
- MAF War Gaming Simulation Center 24.0 km
- Data center in Bukit Jalil 24.9 km · 2.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.