Goyeau Data Centre
Goyeau Data Centre is an operational data center operated by Managed Network Systems in Windsor, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Managed Network Systems |
| Networks | 2 networks PeeringDB. |
| Address | 1163 Goyeau Street |
| Coordinates | 42.30663, -83.03026 |
| Website | mnsi.net |
Power and grid
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 351 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Goyeau Data Centre?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Goyeau Data Centre?
Managed Network Systems.
Data centers near Windsor
- Raeden Michigan 1 3.1 km
- Cogent Detroit 3.4 km
- Quicken Loans data center in Detroit 3.9 km · 7.1 MW
- Verizon Wireless data center in Detroit 4.4 km · 4.6 MW
- Tesla 10k H100 Cluster 12.2 km · 15 MW
- Comcast 17.2 km
- ManagedWay SFJ2 24.5 km
- EdgeConneX Detroit (EDCDET01) 24.7 km · 6.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.