Cogent Detroit
Cogent Detroit is an operational data center operated by Cogent Communications in Detroit, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Cogent Communications |
| Networks | 3 networks PeeringDB. |
| Address | 1320 3rd St |
| Coordinates | 42.33074, -83.05577 |
| Website | cogentco.com/en/cogent-detroit |
Power and grid
| Utility | Wyandotte Municipal Serv Comm (municipal) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Panhandle Eastern PL Co, interstate pipeline, 8.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 455 g CO₂ per kWh (Michigan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5% |
| Industrial power price | USD 0.090 per kWh (Michigan, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 351 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Michigan) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Cogent Detroit?
The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.
Who operates Cogent Detroit?
Cogent Communications.
Data centers near Detroit
- Raeden Michigan 1 294 m
- Quicken Loans data center in Detroit 1.3 km · 7.1 MW
- Verizon Wireless data center in Detroit 1.8 km · 4.6 MW
- Goyeau Data Centre 3.4 km
- Tesla 10k H100 Cluster 10.7 km · 15 MW
- Comcast 17.5 km
- ManagedWay SFJ2 21.1 km
- EdgeConneX Detroit (EDCDET01) 21.4 km · 6.5 MW
More Cogent Communications data centers
- Cogent Elkridge United States
- Cogent Data Center United States
- Cogent Dijon France
- Cogent Toulouse France
- Cogent Tours France
- Cogent Lille France
- Cogent Rouen France
- Omaha Switch United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.