Tesla 10k H100 Cluster
Tesla 10k H100 Cluster is an operational AI data center operated by Tesla in Harper Woods, United States. Its power is about 15 MW. Epoch AI estimates about 10,000 H100-equivalent AI chips (NVIDIA H100 SXM5 80GB).
Key facts
| Status | Operational |
|---|---|
| Operator | Tesla |
| Facility power | 15 MW Reported (Epoch AI or owner data) |
| AI compute | 10,000 H100-equivalents |
| AI chips | NVIDIA H100 SXM5 80GB Reported (Epoch AI or owner data) |
| Chip count | 10,000 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 6,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | "on prem" for Tesla |
| Coordinates | 42.41021, -82.98159 |
Power and grid
| Nearest high-voltage substation | Mack Substation, 120 kV, 2.8 km away (ITC) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Caniff Station, 345 kV, 5.1 km away |
| HV substations within 10 km | 29 |
| Utility | Wyandotte Municipal Serv Comm (municipal) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Michcon Gas Co, intrastate pipeline, 10 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 2.8 GW in 20 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 455 g CO₂ per kWh (Michigan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 42%, coal 23.2%, nuclear 21.7%, wind 8%, solar 2.6%. Clean power: 34.5% |
| Industrial power price | USD 0.090 per kWh (Michigan, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 351 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.78 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Michigan) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Tesla 10k H100 Cluster | NVIDIA H100 SXM5 80GB | 10,000 | 15 MW | 2023-08-28 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Tesla 10k H100 Cluster use?
Public data puts the facility power at about 15 MW. Reported (Epoch AI or owner data).
What chips does Tesla 10k H100 Cluster use?
Reported chips: NVIDIA H100 SXM5 80GB.
How close is Tesla 10k H100 Cluster to the power grid?
The nearest high-voltage substation in OpenStreetMap is Mack Substation (120 kV), about 2.8 km away. The local utility is Wyandotte Municipal Serv Comm, in the MISO balancing area.
How clean is the power for Tesla 10k H100 Cluster?
The grid in Michigan emits about 455 g CO₂ per kWh (2025). Largest sources: gas 42%, coal 23.2%, nuclear 21.7%.
Who operates Tesla 10k H100 Cluster?
Tesla.
Data centers near Harper Woods
- Cogent Detroit 10.7 km
- Raeden Michigan 1 10.8 km
- Quicken Loans data center in Detroit 11.8 km · 7.1 MW
- Verizon Wireless data center in Detroit 12.2 km · 4.6 MW
- Goyeau Data Centre 12.2 km
- ManagedWay TYM1 17.1 km
- ManagedWay TYM2 17.4 km
- Liberty Center One 21.1 km · 2.4 MW
More Tesla data centers
- Tesla Cortex United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.