InfoBunker
InfoBunker is an operational data center operated by InfoBunker, L.L.C. in Boone, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | InfoBunker, L.L.C. |
| Networks | 1 networks PeeringDB. |
| Address | 308 T ave, Bldg #2 |
| Coordinates | 42.16490, -93.79416 |
| Website | infobunker.com |
Power and grid
| Utility | Midland Power Coop (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 5.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.1 °C (2001 to 2025) |
| Cooling degree days | 527 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.03 kWh per m² per day |
| Wind at 50 m | 7 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for InfoBunker?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates InfoBunker?
InfoBunker, L.L.C..
Data centers near Boone
- Microsoft Air Gapped Supercomputer 26.0 km
- Meta 59.3 km · 69 MW
- Meta 59.4 km · 69 MW
- Facebook Altoona Data Center 5 59.5 km · 69 MW
- Altoona Meta Data Center 59.7 km · 306 MW
- IP Pathways DSM1 59.8 km
- Facebook Altoona Data Center 4 59.9 km · 102 MW
- Facebook Altoona Data Center 3 60.3 km · 109 MW
Sources