Facebook Altoona Data Center 3
Facebook Altoona Data Center 3 is an operational data center operated by Meta in Altoona, United States. Our footprint estimate of its power is about 109 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 109 MW (range 54 MW to 174 MW) Estimate from building footprint, low confidence. Footprint estimate: about 90,679 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 47,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | Facebook Altoona Data Center 2 |
| Coordinates | 41.66705, -93.50656 |
Power and grid
| Nearest high-voltage substation | Facebook Data Center, 161 kV, 500 m away (MidAmerican Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Bondurant Substation, 345 kV, 1.1 km away |
| HV substations within 10 km | 11 |
| Utility | Midamerican Energy Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.3 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 586 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.09 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Facebook Altoona Data Center 3 use?
We estimate the facility power at about 109 MW. Estimate from building footprint, low confidence.
What chips does Facebook Altoona Data Center 3 use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How close is Facebook Altoona Data Center 3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Facebook Data Center (161 kV), about 500 m away. The local utility is Midamerican Energy Co, in the MISO balancing area.
How clean is the power for Facebook Altoona Data Center 3?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates Facebook Altoona Data Center 3?
Meta.
Data centers near Altoona
- Altoona Meta Data Center 648 m · 306 MW
- Facebook Altoona Data Center 1 749 m · 49 MW
- Facebook Altoona Data Center 4 821 m · 102 MW
- Facebook Altoona Data Center 5 952 m · 69 MW
- Meta 974 m · 69 MW
- Meta 1.0 km · 69 MW
- LightEdge Des Moines 1 (DSM1) 4.2 km · 6.4 MW
- Data center in Pleasant Hill 12.2 km · 2.3 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data