Meta
Meta is an operational data center operated by Meta in Altoona, United States. Our footprint estimate of its power is about 69 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 69 MW (range 35 MW to 111 MW) Estimate from building footprint, low confidence. Footprint estimate: about 57,833 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 29,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.67580, -93.50604 |
Power and grid
| Utility | Midamerican Energy Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | MISO |
| Nearest gas pipeline | Northern Natural Gas Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 313 g CO₂ per kWh (Iowa, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 58.5%, coal 25.6%, gas 11.6%, solar 2.5%, hydro 1.4%. Clean power: 62.8% |
| Industrial power price | USD 0.093 per kWh (Iowa, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.6 °C (2001 to 2025) |
| Cooling degree days | 586 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.09 kWh per m² per day |
| Wind at 50 m | 6.9 m/s average |
| Water stress today | Low - Medium (10-20%) (Iowa) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta use?
We estimate the facility power at about 69 MW. Estimate from building footprint, low confidence.
What chips does Meta use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How clean is the power for Meta?
The grid in Iowa emits about 313 g CO₂ per kWh (2025). Largest sources: wind 58.5%, coal 25.6%, gas 11.6%.
Who operates Meta?
Meta.
Data centers near Altoona
- Meta 315 m · 69 MW
- Altoona Meta Data Center 792 m · 306 MW
- Facebook Altoona Data Center 3 974 m · 109 MW
- Facebook Altoona Data Center 5 1.0 km · 69 MW
- Facebook Altoona Data Center 4 1.2 km · 102 MW
- Facebook Altoona Data Center 1 1.5 km · 49 MW
- LightEdge Des Moines 1 (DSM1) 4.3 km · 6.4 MW
- Data center in Pleasant Hill 13.2 km · 2.3 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.