Kaiser Data Center
Kaiser Data Center is an operational data center in Napa, United States. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 18 MW (range 8.8 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,737 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 38.25406, -122.27309 |
Power and grid
| Utility | Pacific Gas & Electric Co. (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | CISO |
| Nearest gas pipeline | California Gas Transmission Co, intrastate pipeline, 1.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 189 g CO₂ per kWh (California, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 37.4%, gas 30.4%, hydro 11.7%, nuclear 7.3%, wind 6.7%. Clean power: 69.7% |
| Industrial power price | USD 0.241 per kWh (California, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Extremely High (>80%) (California) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Kaiser Data Center use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How clean is the power for Kaiser Data Center?
The grid in California emits about 189 g CO₂ per kWh (2025). Largest sources: solar 37.4%, gas 30.4%, hydro 11.7%.
Data centers near Napa
- PG&E Datacenter 18.0 km · 6.7 MW
- X2nSat Petaluma 34.4 km
- e360 37.3 km
- Lawrence Berkeley NL NERSC Perlmutter 41.9 km · 6.9 MW
- Open Computing Facility 42.7 km
- Evocative Emeryville (EM1) 45.3 km
- Level(3) Oakland 46.6 km
- Digital Realty OAK (720 2nd St) 50.6 km · 20 MW