LogInToUs, Inc.
LogInToUs, Inc. is an operational data center operated by Nicholas J Brockway in Malone, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Nicholas J Brockway |
| Address | 234 Park Street |
| Coordinates | 44.86106, -74.29401 |
| Website | logintous.com |
Power and grid
| Utility | Niagara Mohawk Power Corp. (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | NYIS |
| Nearest gas pipeline | St Lawrence Gas Co, interstate pipeline, 37.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.2 °C (2001 to 2025) |
| Cooling degree days | 257 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.6 kWh per m² per day |
| Wind at 50 m | 5.1 m/s average |
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for LogInToUs, Inc.?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates LogInToUs, Inc.?
Nicholas J Brockway.
Data centers near Malone
- NYGC Chateaugay 17.8 km · 8.5 MW
- Old Main 58.3 km · 2.9 MW
- OVHcloud, Centre de données de Beauharnois 58.8 km · 53 MW
- Equinix MT2 64.1 km
- Root Data Center MTL-R2 69.3 km
- Aptum MTL2 73.1 km
- Enovum Data Centers - MTL02 75.7 km
- Vantage Data Centers (QC4) 78.5 km · 8.3 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.