NYGC Chateaugay
NYGC Chateaugay is an operational data center operated by 2CRSi in Malone, United States. Our footprint estimate of its power is about 8.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | 2CRSi |
| Facility power | 8.5 MW (range 3.4 MW to 21 MW) Estimate from building footprint, low confidence. Footprint estimate: about 71,084 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 3,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 44.89301, -74.07288 |
Power and grid
| Utility | Niagara Mohawk Power Corp. (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | NYIS |
| Grid carbon intensity | 268 g CO₂ per kWh (New York, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.4%, nuclear 20.7%, hydro 18.5%, solar 7.6%, wind 5%. Clean power: 52.9% |
| Industrial power price | USD 0.105 per kWh (New York, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Water stress today | Low - Medium (10-20%) (New York) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
|---|---|
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does NYGC Chateaugay use?
We estimate the facility power at about 8.5 MW. Estimate from building footprint, low confidence.
How clean is the power for NYGC Chateaugay?
The grid in New York emits about 268 g CO₂ per kWh (2025). Largest sources: gas 45.4%, nuclear 20.7%, hydro 18.5%.
Who operates NYGC Chateaugay?
2CRSi.
Data centers near Malone
- LogInToUs, Inc. 17.8 km
- OVHcloud, Centre de données de Beauharnois 48.3 km · 53 MW
- Equinix MT2 57.7 km
- Root Data Center MTL-R2 60.4 km
- Aptum MTL2 63.5 km
- Enovum Data Centers - MTL02 65.7 km
- Vantage Data Centers (QC4) 68.1 km · 8.3 MW
- Root Data Center MTL-R1 69.4 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.