LRZ SuperMUC-NG is an operational data center operated by Leibniz-Rechenzentrum (LRZ) der Bayerischen Akademie der Wissenschaften in Garching, Germany. Our footprint estimate of its power is about 19 MW.

Key facts

StatusOperational
OperatorLeibniz-Rechenzentrum (LRZ) der Bayerischen Akademie der Wissenschaften
Facility power19 MW (range 9.3 MW to 30 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,592 m² building outline x 6 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 8,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates48.26181, 11.66650

Power and grid

Grid carbon intensity334 g CO₂ per kWh (Germany, 2025)
Average of all power made in the area. Ember.
Grid power mixwind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5%
Industrial power priceEUR 0.146 per kWh (Germany, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32.6 °C (2001 to 2025)
Cooling degree days109 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.25 kWh per m² per day
Wind at 50 m5.5 m/s average
Water stress todayMedium - High (20-40%) (Germany)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does LRZ SuperMUC-NG use?

We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.

How clean is the power for LRZ SuperMUC-NG?

The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.

Who operates LRZ SuperMUC-NG?

Leibniz-Rechenzentrum (LRZ) der Bayerischen Akademie der Wissenschaften.

Data centers near Garching

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.