Max-Planck-Gesellschaft Raven
Max-Planck-Gesellschaft Raven is an operational AI data center operated by Max Planck Society in Garching, Germany. Its power is about 0.7 MW. Epoch AI estimates about 242 H100-equivalent AI chips (NVIDIA A100).
Key facts
| Status | Operational |
|---|---|
| Operator | Max Planck Society |
| Facility power | 0.7 MW Reported (Epoch AI or owner data) |
| AI compute | 242 H100-equivalents |
| AI chips | NVIDIA A100 Reported (Epoch AI or owner data) |
| Chip count | 768 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 280 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Gießenbachstraße 2, 85748 Garching bei München, Germany |
| Coordinates | 48.26190, 11.67174 |
Power and grid
| Nearest high-voltage substation | Umspannwerk Garching, 110 kV, 900 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hauptumspannwerk Föhring, 380 kV, 9.5 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 2.8 GW in 62 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.6 °C (2001 to 2025) |
| Cooling degree days | 109 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Max-Planck-Gesellschaft Raven | NVIDIA A100 | 768 | 0.7 MW | 2021-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Max-Planck-Gesellschaft Raven use?
Public data puts the facility power at about 0.7 MW. Reported (Epoch AI or owner data).
What chips does Max-Planck-Gesellschaft Raven use?
Reported chips: NVIDIA A100.
How close is Max-Planck-Gesellschaft Raven to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Garching (110 kV), about 900 m away.
How clean is the power for Max-Planck-Gesellschaft Raven?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates Max-Planck-Gesellschaft Raven?
Max Planck Society.
Data centers near Garching
- Rechenzentrum Garching 137 m · 1.6 MW
- LRZ SuperMUC-NG 388 m · 19 MW
- EXA Edge DC Garching 4.5 km
- nLighten Munich MUC1 4.5 km
- Data center in Unterföhring 6.0 km · 2.3 MW
- NTT Munich 2 Data Center (MUC2) 8.0 km
- EMC Home of Data MUC I/II - MuCon-X 9.4 km
- Arelion Munich MCN 10.2 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.