nLighten Munich MUC1
nLighten Munich MUC1 is an operational data center operated by nLighten HQ in Garching bei München, Germany. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | nLighten HQ |
| Networks | 1 networks PeeringDB. |
| Also known as | ITENOS München (MUC1) |
| Address | Robert-Bosch-Str. 12 |
| Coordinates | 48.25508, 11.61155 |
| Website | nlighten.com/en/germany-data-center/munich |
Power and grid
| Nearest high-voltage substation | Umspannwerk Hochbrück, 110 kV, 1.1 km away (Bayernwerk) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Hauptumspannwerk Föhring, 380 kV, 8.7 km away |
| HV substations within 10 km | 12 |
| Power plants within 50 km | 2.8 GW in 61 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 334 g CO₂ per kWh (Germany, 2025) Average of all power made in the area. Ember. |
| Grid power mix | wind 26.6%, coal 21%, solar 18%, gas 16.8%, bioenergy 10.1%. Clean power: 58.5% |
| Industrial power price | EUR 0.146 per kWh (Germany, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32.6 °C (2001 to 2025) |
| Cooling degree days | 109 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.25 kWh per m² per day |
| Wind at 50 m | 5.5 m/s average |
| Water stress today | Medium - High (20-40%) (Germany) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is nLighten Munich MUC1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Umspannwerk Hochbrück (110 kV), about 1.1 km away.
How clean is the power for nLighten Munich MUC1?
The grid in Germany emits about 334 g CO₂ per kWh (2025). Largest sources: wind 26.6%, coal 21%, solar 18%.
Who operates nLighten Munich MUC1?
nLighten HQ.
Data centers near Garching bei München
- EXA Edge DC Garching 74 m
- LRZ SuperMUC-NG 4.1 km · 19 MW
- Max-Planck-Gesellschaft Raven 4.5 km · 0.7 MW
- Rechenzentrum Garching 4.6 km · 1.6 MW
- NTT Munich 2 Data Center (MUC2) 5.0 km
- Data center in Unterföhring 6.2 km · 2.3 MW
- EMC Home of Data MUC I/II - MuCon-X 6.8 km
- Arelion Munich MCN 7.6 km
More nLighten HQ data centers
- nLighten Swindon BRS2 United Kingdom
- nLighten Leeds LBA1 United Kingdom
- nLighten Strasbourg SXB1 France
- nLighten Besancon MLH1 France
- nLighten Liverpool LPL1 United Kingdom
- nLighten Paris PAR2 France
- nLighten Sophia Antipolis NCE1 France
- nLighten Paris PAR1 France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.