MEGA Plus (iAdvantage Hong Kong)
MEGA Plus (iAdvantage Hong Kong) is an operational data center operated by iAdvantage Hong Kong in Hong Kong, Hong Kong SAR China. Our footprint estimate of its power is about 19 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | iAdvantage Hong Kong |
| Facility power | 19 MW (range 9.6 MW to 31 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,674 m² building outline x 6 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,100 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 16 networks, 1 internet exchanges PeeringDB. |
| Also known as | MEGA IDC (iAdvantage Ltd) |
| Address | 299 Wan Po Road, Tseung Kwan O, New Territories |
| Coordinates | 22.29357, 114.27378 |
| Website | iadvantage.net |
Power and grid
| Nearest high-voltage substation | 將軍澳400仟伏變電站 Tseung Kwan O 400kV Substation, 400 kV, 4.5 km away (中華電力有限公司 CLP Power Hong Kong Limited) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Power plants within 50 km | 24 GW in 14 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 673 g CO₂ per kWh (Hong Kong SAR China, 2024) Average of all power made in the area. Ember. |
| Grid power mix | gas 63.8%, coal 33.5%, oil and other fossil 1.2%, solar 1%. Clean power: 1.5% |
Climate and water
| Average temperature | 23.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.6 °C (2001 to 2025) |
| Cooling degree days | 2,112 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.14 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MEGA Plus (iAdvantage Hong Kong) use?
We estimate the facility power at about 19 MW. Estimate from building footprint, low confidence.
How close is MEGA Plus (iAdvantage Hong Kong) to the power grid?
The nearest high-voltage substation in OpenStreetMap is 將軍澳400仟伏變電站 Tseung Kwan O 400kV Substation (400 kV), about 4.5 km away.
How clean is the power for MEGA Plus (iAdvantage Hong Kong)?
The grid in Hong Kong SAR China emits about 673 g CO₂ per kWh (2024). Largest sources: gas 63.8%, coal 33.5%, oil and other fossil 1.2%.
Who operates MEGA Plus (iAdvantage Hong Kong)?
iAdvantage Hong Kong.
Data centers near Hong Kong
- Equinix HK5 - Hong Kong 108 m · 1.1 MW
- Mega IDC 163 m · 1.5 MW
- Telehouse - Hong Kong CCC (HKCOLO TKO) 319 m · 2.2 MW
- China Mobile International - GNC Hong Kong 536 m · 41 MW
- Global Switch Hong Kong 703 m
- TOWNGAS TELECOM DATA CENTRE 2 750 m · 1.6 MW
- Data center in LOHAS Park 890 m · 22 MW
- NTT Com Asia Hong Kong Financial Data Center 894 m · 9.8 MW
More iAdvantage Hong Kong data centers
- JUMBO (iAdvantage Hong Kong) Hong Kong SAR China
- MEGA Two (iAdvantage Hong Kong) Hong Kong SAR China
- MEGA-i (iAdvantage Hong Kong) Hong Kong SAR China
- ONE (iAdvantage Hong Kong) Hong Kong SAR China
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.