Data Center Directory

Meta Aiken Data Center

Meta Aiken Data Center is a data center under construction operated by Meta in Aiken, United States. Our footprint estimate of its power is about 133 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Power demand is growing at this site

Key facts

StatusUnder construction
OperatorMeta
Facility power133 MW (range 53 MW to 331 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,104,345 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 57,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates33.64230, -81.84426

Power and grid

UtilityAiken Electric Coop INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySC
Nearest gas pipelineSouthern Natural Gas Co, interstate pipeline, 7.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity288 g CO₂ per kWh (South Carolina, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3%
Industrial power priceUSD 0.079 per kWh (South Carolina, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43 °C (2001 to 2025)
Cooling degree days1,306 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.63 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayMedium - High (20-40%) (South Carolina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Meta Aiken Data Center use?

We estimate the facility power at about 133 MW. Estimate from building footprint, low confidence.

What chips does Meta Aiken Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How clean is the power for Meta Aiken Data Center?

The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.

Who operates Meta Aiken Data Center?

Meta.

Data centers near Aiken

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.