Meta Aiken Data Center
Meta Aiken Data Center is a data center under construction operated by Meta in Aiken, United States. Our footprint estimate of its power is about 133 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | Meta |
| Facility power | 133 MW (range 53 MW to 331 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,104,345 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 57,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.64230, -81.84426 |
Power and grid
| Utility | Aiken Electric Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | SC |
| Nearest gas pipeline | Southern Natural Gas Co, interstate pipeline, 7.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 288 g CO₂ per kWh (South Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3% |
| Industrial power price | USD 0.079 per kWh (South Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 1,306 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.63 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Medium - High (20-40%) (South Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Aiken Data Center use?
We estimate the facility power at about 133 MW. Estimate from building footprint, low confidence.
What chips does Meta Aiken Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How clean is the power for Meta Aiken Data Center?
The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.
Who operates Meta Aiken Data Center?
Meta.
Data centers near Aiken
- Meta Aiken 11.0 km · 168 MW
- Columbia County Community Broadband Utility 29.1 km
- T5@Augusta 36.8 km
- DartPoints Columbia, SC - CAE1 84.4 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.