Meta Aiken

Meta Aiken is an operational AI data center operated by Meta in Trenton, United States. Its power is about 168 MW. Epoch AI estimates about 147,000 H100-equivalent AI chips (B300).

Key facts

StatusOperational
OperatorMeta
UsersMeta
Facility power168 MW
Reported (Epoch AI or owner data)
IT power129 MW
AI compute147,000 H100-equivalents
AI chipsB300
Reported (Epoch AI or owner data)
GPU capacity if all AIabout 72,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Capital costUSD 4.9 billion
Epoch AI estimate, 2025 USD.
Address7601 State Hwy 105, Trenton, SC 29847, USA
Coordinates33.74166, -81.84234 (city level)

Power and grid

Nearest high-voltage substationTrenton Substation, 115 kV, 3.6 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationShaw Creek Solar Substation, 230 kV, 11.3 km away
HV substations within 10 km4
UtilityAiken Electric Coop INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authoritySC
Nearest gas pipelineSouth Carolina PL Corp, interstate pipeline, 8.6 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.5 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity288 g CO₂ per kWh (South Carolina, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3%
Industrial power priceUSD 0.079 per kWh (South Carolina, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature18 °C
NASA POWER, average of 2001 to 2025.
Highest temperature43 °C (2001 to 2025)
Cooling degree days1,306 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.63 kWh per m² per day
Wind at 50 m5 m/s average
Water stress todayMedium - High (20-40%) (South Carolina)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Build timeline

DatePowerH100eWhat the satellite images and filings show
2024-05-3000Land clearing begins
2026-04-0800Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site. We expect around 3 more months needed for commissioning and server installation.
2026-08-0790 MW78,000Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2.
2026-11-05168 MW147,000Building 2 is operational assuming a 3 month lag compared to Building 1.

Source: Epoch AI Frontier Data Centers.

Chip deployments

DateChipUnitsBasis
2026-08-07B30031,078Estimate
2026-11-05B30058,271Estimate

Satellite view

Questions

How much power does Meta Aiken use?

Public data puts the facility power at about 168 MW. Reported (Epoch AI or owner data).

What chips does Meta Aiken use?

Reported chips: B300.

How close is Meta Aiken to the power grid?

The nearest high-voltage substation in OpenStreetMap is Trenton Substation (115 kV), about 3.6 km away. The local utility is Aiken Electric Coop INC, in the SC balancing area.

How clean is the power for Meta Aiken?

The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.

Who operates Meta Aiken?

Meta. Reported users: Meta.