Meta Aiken
Meta Aiken is an operational AI data center operated by Meta in Trenton, United States. Its power is about 168 MW. Epoch AI estimates about 147,000 H100-equivalent AI chips (B300).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Users | Meta |
| Facility power | 168 MW Reported (Epoch AI or owner data) |
| IT power | 129 MW |
| AI compute | 147,000 H100-equivalents |
| AI chips | B300 Reported (Epoch AI or owner data) |
| GPU capacity if all AI | about 72,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Capital cost | USD 4.9 billion Epoch AI estimate, 2025 USD. |
| Address | 7601 State Hwy 105, Trenton, SC 29847, USA |
| Coordinates | 33.74166, -81.84234 (city level) |
Power and grid
| Nearest high-voltage substation | Trenton Substation, 115 kV, 3.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Shaw Creek Solar Substation, 230 kV, 11.3 km away |
| HV substations within 10 km | 4 |
| Utility | Aiken Electric Coop INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | SC |
| Nearest gas pipeline | South Carolina PL Corp, interstate pipeline, 8.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.5 GW in 18 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 288 g CO₂ per kWh (South Carolina, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 53.9%, gas 21.4%, coal 17.3%, solar 3.8%, hydro 2.1%. Clean power: 61.3% |
| Industrial power price | USD 0.079 per kWh (South Carolina, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 18 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 43 °C (2001 to 2025) |
| Cooling degree days | 1,306 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.63 kWh per m² per day |
| Wind at 50 m | 5 m/s average |
| Water stress today | Medium - High (20-40%) (South Carolina) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2024-05-30 | 0 | 0 | Land clearing begins |
| 2026-04-08 | 0 | 0 | Buildings 1 and 2 are nearly complete, but there's still some equipment strewn around the site. We expect around 3 more months needed for commissioning and server installation. |
| 2026-08-07 | 90 MW | 78,000 | Building 1 is confirmed operational via drone imagery with 8/9 group of coolers with spinning fans. Imagery also confirms all cooling and power infrastructure in place for Building 2. |
| 2026-11-05 | 168 MW | 147,000 | Building 2 is operational assuming a 3 month lag compared to Building 1. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-08-07 | B300 | 31,078 | Estimate |
| 2026-11-05 | B300 | 58,271 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta Aiken use?
Public data puts the facility power at about 168 MW. Reported (Epoch AI or owner data).
What chips does Meta Aiken use?
Reported chips: B300.
How close is Meta Aiken to the power grid?
The nearest high-voltage substation in OpenStreetMap is Trenton Substation (115 kV), about 3.6 km away. The local utility is Aiken Electric Coop INC, in the SC balancing area.
How clean is the power for Meta Aiken?
The grid in South Carolina emits about 288 g CO₂ per kWh (2025). Largest sources: nuclear 53.9%, gas 21.4%, coal 17.3%.
Who operates Meta Aiken?
Meta. Reported users: Meta.
Data centers near Trenton
- Meta Aiken Data Center 11.0 km · 133 MW
- Columbia County Community Broadband Utility 34.8 km
- T5@Augusta 44.6 km
- DartPoints Columbia, SC - CAE1 79.8 km
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.