Meta is an operational data center operated by Meta in Eagle Mountain, United States. Our footprint estimate of its power is about 86 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Meta |
| Facility power | 86 MW (range 43 MW to 138 MW) Estimate from building footprint, low confidence. Footprint estimate: about 71,760 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some Meta MTIA) Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference. |
| GPU capacity if all AI | about 37,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.26556, -112.01513 |
Power and grid
| Utility | Pacificorp (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PACW, PACE |
| Nearest gas pipeline | Kern River Gas Trans Co, interstate pipeline, 2.5 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.1 °C (2001 to 2025) |
| Cooling degree days | 469 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.7 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Meta use?
We estimate the facility power at about 86 MW. Estimate from building footprint, low confidence.
What chips does Meta use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).
How clean is the power for Meta?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates Meta?
Meta.
Data centers near Eagle Mountain
- Meta Eagle Mountain Data Center 308 m · 208 MW
- Meta 367 m · 35 MW
- Meta 602 m · 27 MW
- Meta 752 m · 86 MW
- QTS Eagle Mountain 1.7 km
- Meta Eagle Mountain 4.9 km · 179 MW
- Flexential - Salt Lake City/Lindon (SLC03) 25.5 km
- DataBank Salt Lake City (SLC2) 25.6 km · 21 MW
More Meta data centers
- Meta Hyperion United States
- QTS Cedar Rapids United States
- Meta Prometheus United States
- Meta Bowling Green United States
- Meta Montgomery United States
- QTS Eagle Mountain United States
- Meta Huntsville Data Center United States
- Altoona Meta Data Center United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.