Meta is an operational data center operated by Meta in Eagle Mountain, United States. Our footprint estimate of its power is about 35 MW. Likely chips: NVIDIA GPUs (some Meta MTIA) (guess).

Key facts

StatusOperational
OperatorMeta
Facility power35 MW (range 18 MW to 56 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 29,419 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some Meta MTIA)
Guess from the operator, not confirmed. Meta trains on NVIDIA GPUs and adds in-house MTIA chips for inference.
GPU capacity if all AIabout 15,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.26586, -112.01943

Power and grid

UtilityPacificorp (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPACW, PACE
Nearest gas pipelineKern River Gas Trans Co, interstate pipeline, 2.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity200 g CO₂ per kWh (Oregon, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2%
Industrial power priceUSD 0.087 per kWh (Oregon, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.1 °C (2001 to 2025)
Cooling degree days469 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.8 kWh per m² per day
Wind at 50 m3.7 m/s average
Water stress todayLow - Medium (10-20%) (Oregon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Meta use?

We estimate the facility power at about 35 MW. Estimate from building footprint, low confidence.

What chips does Meta use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Meta MTIA).

How clean is the power for Meta?

The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.

Who operates Meta?

Meta.

Data centers near Eagle Mountain

More Meta data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.