MEVSPACE DC-1
MEVSPACE DC-1 is an operational data center operated by Mevspace sp. z o.o. in Wyszków, Poland. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Mevspace sp. z o.o. |
| Facility power | 1.4 MW (range 0.6 MW to 3.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 11,664 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 15 networks PeeringDB. |
| Also known as | DC Mevspace 1 |
| Address | ul.Serwerowa 10 |
| Coordinates | 52.61294, 21.42777 |
| Website | mevspace.com |
Power and grid
| Nearest high-voltage substation | Stacja elektroenergetyczna "Wyszków 2" 110kV/15kV, 110 kV, 1 km away (PGE Dystrybucja) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Stacja elektroenergetyczna 400(220)/110kV "Wyszków", 220 kV, 4.5 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 819 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 591 g CO₂ per kWh (Poland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2% |
| Industrial power price | EUR 0.169 per kWh (Poland, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 8.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.5 °C (2001 to 2025) |
| Cooling degree days | 164 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.98 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (Poland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MEVSPACE DC-1 use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How close is MEVSPACE DC-1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna "Wyszków 2" 110kV/15kV (110 kV), about 1 km away.
How clean is the power for MEVSPACE DC-1?
The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.
Who operates MEVSPACE DC-1?
Mevspace sp. z o.o..
Data centers near Wyszków
- Centrum Technologii ICM UW 42.8 km · 5.8 MW
- T-Mobile Warszawa-Szlachecka 43.0 km · 5.9 MW
- 3S Data Center Warsaw 44.3 km
- DC 11.11 46.8 km · 1.2 MW
- 3HCloud - WAW-2 46.8 km · 4.2 MW
- ATMAN Data Center Warsaw-1 (WAW-1, Grochowska 21A) 46.9 km
- Vantage Warsaw WAW1 49.4 km · 3.7 MW
- Netia Warsaw (WARSC001) 51.4 km
More Mevspace sp. z o.o. data centers
- MEVSPACE DC-2 Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.