MEVSPACE DC-1

MEVSPACE DC-1 is an operational data center operated by Mevspace sp. z o.o. in Wyszków, Poland. Our footprint estimate of its power is about 1.4 MW.

Key facts

StatusOperational
OperatorMevspace sp. z o.o.
Facility power1.4 MW (range 0.6 MW to 3.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 11,664 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks15 networks
PeeringDB.
Also known asDC Mevspace 1
Addressul.Serwerowa 10
Coordinates52.61294, 21.42777
Websitemevspace.com

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna "Wyszków 2" 110kV/15kV, 110 kV, 1 km away (PGE Dystrybucja)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 400(220)/110kV "Wyszków", 220 kV, 4.5 km away
HV substations within 10 km3
Power plants within 50 km819 MW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature8.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.5 °C (2001 to 2025)
Cooling degree days164 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.98 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does MEVSPACE DC-1 use?

We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.

How close is MEVSPACE DC-1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna "Wyszków 2" 110kV/15kV (110 kV), about 1 km away.

How clean is the power for MEVSPACE DC-1?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates MEVSPACE DC-1?

Mevspace sp. z o.o..

Data centers near Wyszków

More Mevspace sp. z o.o. data centers

Sources