Microsoft Cheyenne Business Parkway Data Center
Microsoft Cheyenne Business Parkway Data Center is an operational data center in Cheyenne, United States. Our footprint estimate of its power is about 44 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 44 MW (range 18 MW to 111 MW) Estimate from building footprint, low confidence. Footprint estimate: about 368,592 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 19,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.14219, -104.71620 |
Power and grid
| Nearest high-voltage substation | Campstool Substation, 115 kV, 200 m away (Cheyenne Light Fuel and Power) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Archer Substation, 230 kV, 5.6 km away |
| HV substations within 10 km | 10 |
| Utility | High West Energy, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | WACM |
| Nearest gas pipeline | Trailblazer Pipeline Co, interstate pipeline, 19.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 1.1 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 620 g CO₂ per kWh (Wyoming, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 58.5%, wind 27.1%, gas 10%, hydro 2.1%, solar 1.2%. Clean power: 30.4% |
| Industrial power price | USD 0.088 per kWh (Wyoming, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 454 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.57 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | High (40-80%) (Wyoming) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Cheyenne Business Parkway Data Center use?
We estimate the facility power at about 44 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Cheyenne Business Parkway Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Cheyenne Business Parkway Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Campstool Substation (115 kV), about 200 m away. The local utility is High West Energy, INC, in the WACM balancing area.
How clean is the power for Microsoft Cheyenne Business Parkway Data Center?
The grid in Wyoming emits about 620 g CO₂ per kWh (2025). Largest sources: coal 58.5%, wind 27.1%, gas 10%.
Data centers near Cheyenne
- Lunavi - Cheyenne 2.5 km
- Cogent Cheyenne 8.1 km
- Meta Cheyenne 8.7 km · 182 MW
- Mountain West Technologies - Cheyenne 10.1 km
- Data center in Cheyenne 10.3 km · 22 MW
- Microsoft Bison Business Park Data Center 10.6 km · 94 MW
- Data center in Cheyenne 11.5 km · 30 MW
- Meta Cheyenne Data Center 11.6 km · 215 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.