Microsoft Cheyenne Business Parkway Data Center is an operational data center in Cheyenne, United States. Our footprint estimate of its power is about 44 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
Facility power44 MW (range 18 MW to 111 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 368,592 m² site outline x 0.12 kW per m² of land.
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
GPU capacity if all AIabout 19,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.14219, -104.71620

Power and grid

Nearest high-voltage substationCampstool Substation, 115 kV, 200 m away (Cheyenne Light Fuel and Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationArcher Substation, 230 kV, 5.6 km away
HV substations within 10 km10
UtilityHigh West Energy, INC (cooperative)
Electric retail service territory (HIFLD, US government).
Balancing authorityWACM
Nearest gas pipelineTrailblazer Pipeline Co, interstate pipeline, 19.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.1 GW in 5 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity620 g CO₂ per kWh (Wyoming, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 58.5%, wind 27.1%, gas 10%, hydro 2.1%, solar 1.2%. Clean power: 30.4%
Industrial power priceUSD 0.088 per kWh (Wyoming, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days454 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.57 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayHigh (40-80%) (Wyoming)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Microsoft Cheyenne Business Parkway Data Center use?

We estimate the facility power at about 44 MW. Estimate from building footprint, low confidence.

What chips does Microsoft Cheyenne Business Parkway Data Center use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft Cheyenne Business Parkway Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Campstool Substation (115 kV), about 200 m away. The local utility is High West Energy, INC, in the WACM balancing area.

How clean is the power for Microsoft Cheyenne Business Parkway Data Center?

The grid in Wyoming emits about 620 g CO₂ per kWh (2025). Largest sources: coal 58.5%, wind 27.1%, gas 10%.