Microsoft Columbia Data Center
Microsoft Columbia Data Center is an operational data center in Quincy, United States. Our footprint estimate of its power is about 30 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 30 MW (range 12 MW to 75 MW) Estimate from building footprint, low confidence. Footprint estimate: about 250,176 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 13,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 47.23911, -119.86254 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 300 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 4 |
| Utility | PUD No 2 Of Grant County (political subdivision) Electric retail service territory (HIFLD, US government). |
| Balancing authority | GCPD |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 17.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.1 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 135 g CO₂ per kWh (Washington, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 62.8%, gas 15.7%, wind 8.3%, nuclear 7.5%, coal 3%. Clean power: 80.9% |
| Industrial power price | USD 0.074 per kWh (Washington, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 327 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.11 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Low - Medium (10-20%) (Washington) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Columbia Data Center use?
We estimate the facility power at about 30 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Columbia Data Center use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Columbia Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 300 m away. The local utility is PUD No 2 Of Grant County, in the GCPD balancing area.
How clean is the power for Microsoft Columbia Data Center?
The grid in Washington emits about 135 g CO₂ per kWh (2025). Largest sources: hydro 62.8%, gas 15.7%, wind 8.3%.
Data centers near Quincy
- Data center in Quincy 258 m · 2.7 MW
- NTTData Data Center 637 m · 29 MW
- CyrusOne Quincy 753 m · 16 MW
- Azure OpenAI GPT-3 Cluster 1.7 km · 6.6 MW
- Microsoft 1.9 km · 13 MW
- Data center in Quincy 2.5 km · 19 MW
- Data center in Quincy 2.6 km · 3 MW
- Yahoo Data Center 2.8 km · 25 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.