MVM NET Adatközpont Kft. data center in Göd
MVM NET Adatközpont Kft. data center in Göd is an operational data center operated by MVM NET Adatközpont Kft. in Göd, Hungary. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | MVM NET Adatközpont Kft. |
| Facility power | 1 MW (range 0.5 MW to 1.6 MW) Estimate from building footprint, low confidence. Footprint estimate: about 813 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ady Endre út, 2131, Göd |
| Coordinates | 47.69000, 19.16256 |
Power and grid
| Nearest high-voltage substation | Göd alállomás, 400 kV, 300 m away (MAVIR) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 2.2 GW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 162 g CO₂ per kWh (Hungary, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 40.1%, solar 27.1%, gas 20.3%, bioenergy 6%, coal 3.3%. Clean power: 75.4% |
| Industrial power price | EUR 0.176 per kWh (Hungary, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40 °C (2001 to 2025) |
| Cooling degree days | 392 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.48 kWh per m² per day |
| Wind at 50 m | 5.6 m/s average |
| Water stress today | Low (<10%) (Hungary) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does MVM NET Adatközpont Kft. data center in Göd use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How close is MVM NET Adatközpont Kft. data center in Göd to the power grid?
The nearest high-voltage substation in OpenStreetMap is Göd alállomás (400 kV), about 300 m away.
How clean is the power for MVM NET Adatközpont Kft. data center in Göd?
The grid in Hungary emits about 162 g CO₂ per kWh (2025). Largest sources: nuclear 40.1%, solar 27.1%, gas 20.3%.
Who operates MVM NET Adatközpont Kft. data center in Göd?
MVM NET Adatközpont Kft..
Data centers near Göd
- Drávanet Zrt. data center in Budapest 16.6 km
- ATW data center in Budapest 20.7 km
- Invitech DC14 20.7 km
- BIX Building (Victor Hugo street) 20.7 km
- DoclerNet 21.8 km
- Magyar Telekom Cloud & DataCenter 22.3 km · 44 MW
- Invitech DC10 22.8 km · 18 MW
- 2Connect DC10 22.8 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.