Data Center Directory

MVM NET Adatközpont Kft. data center in Göd

MVM NET Adatközpont Kft. data center in Göd is an operational data center operated by MVM NET Adatközpont Kft. in Göd, Hungary. Our footprint estimate of its power is about 1 MW.

Key facts

StatusOperational
OperatorMVM NET Adatközpont Kft.
Facility power1 MW (range 0.5 MW to 1.6 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 813 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 430 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressAdy Endre út, 2131, Göd
Coordinates47.69000, 19.16256

Power and grid

Nearest high-voltage substationGöd alállomás, 400 kV, 300 m away (MAVIR)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
Power plants within 50 km2.2 GW in 27 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity162 g CO₂ per kWh (Hungary, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 40.1%, solar 27.1%, gas 20.3%, bioenergy 6%, coal 3.3%. Clean power: 75.4%
Industrial power priceEUR 0.176 per kWh (Hungary, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40 °C (2001 to 2025)
Cooling degree days392 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.48 kWh per m² per day
Wind at 50 m5.6 m/s average
Water stress todayLow (<10%) (Hungary)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does MVM NET Adatközpont Kft. data center in Göd use?

We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.

How close is MVM NET Adatközpont Kft. data center in Göd to the power grid?

The nearest high-voltage substation in OpenStreetMap is Göd alállomás (400 kV), about 300 m away.

How clean is the power for MVM NET Adatközpont Kft. data center in Göd?

The grid in Hungary emits about 162 g CO₂ per kWh (2025). Largest sources: nuclear 40.1%, solar 27.1%, gas 20.3%.

Who operates MVM NET Adatközpont Kft. data center in Göd?

MVM NET Adatközpont Kft..

Data centers near Göd

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.