Data Center Directory

NWT Data Center

NWT Data Center is an operational data center operated by Biznesshosting, Inc. DBA VOLICO in Miami, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorBiznesshosting, Inc. DBA VOLICO
Networks1 networks
PeeringDB.
Address100 N.Biscayne Blvd
Coordinates25.77558, -80.18819

Power and grid

UtilityFlorida Power & Light Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityFPL
Nearest gas pipelineFlorida Gas Trans Co, interstate pipeline, 8.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity436 g CO₂ per kWh (Florida, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6%
Industrial power priceUSD 0.089 per kWh (Florida, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature25.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.9 °C (2001 to 2025)
Cooling degree days2,641 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.11 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayHigh (40-80%) (Florida)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for NWT Data Center?

The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.

Who operates NWT Data Center?

Biznesshosting, Inc. DBA VOLICO.

Data centers near Miami

More Biznesshosting, Inc. DBA VOLICO data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.