CoreSite - Miami (MI1)
CoreSite - Miami (MI1) is an operational data center operated by CoreSite in Miami, United States. Our footprint estimate of its power is about 1.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CoreSite |
| Facility power | 1.5 MW (range 0.7 MW to 2.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,236 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 640 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 21 networks, 2 internet exchanges PeeringDB. |
| Address | 2115 NW 22nd Street |
| Coordinates | 25.79755, -80.23004 |
| Website | coresite.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 1.1 km away (Florida Power & Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 230 kV, 1.9 km away |
| HV substations within 10 km | 46 |
| Utility | Florida Power & Light Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | FPL |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.2 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 25.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.9 °C (2001 to 2025) |
| Cooling degree days | 2,641 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.11 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CoreSite - Miami (MI1) use?
We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.
How close is CoreSite - Miami (MI1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 1.1 km away. The local utility is Florida Power & Light Co, in the FPL balancing area.
How clean is the power for CoreSite - Miami (MI1)?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates CoreSite - Miami (MI1)?
CoreSite.
Data centers near Miami
- Equinix MI1 - Miami, NOTA 4.0 km · 69 MW
- Level(3) Miami (5th St) 4.2 km
- Equinix MI2 - Miami 4.4 km
- NWT Data Center 4.8 km
- Peer-Point Colocation 5.1 km
- iM Critical Miami 6.7 km
- NocRoom Miami IT Services 8.8 km
- CoreSite - Miami (MI2) 10.4 km
More CoreSite data centers
- CoreSite - Reston (VA3) United States
- CoreSite - Los Angeles (LA1) One Wilshire United States
- CoreSite - Los Angeles (LA2) United States
- CoreSite - Denver (DE1) United States
- CoreSite - Reston (VA1) United States
- Coresite - Milpitas (SV2) United States
- CoreSite - Boston (BO1) United States
- CoreSite - Atlanta (AT2) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.