Level(3) Miami (5th St)
Level(3) Miami (5th St) is an operational data center operated by Lumen Technologies in Miami, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lumen Technologies |
| Networks | 1 networks PeeringDB. |
| Address | 49 NE 5th St |
| Coordinates | 25.77901, -80.19296 |
| Website | level3.com |
Power and grid
| Utility | Florida Power & Light Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | FPL |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 7.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 25.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.9 °C (2001 to 2025) |
| Cooling degree days | 2,641 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.11 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Level(3) Miami (5th St)?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates Level(3) Miami (5th St)?
Lumen Technologies.
Data centers near Miami
- Equinix MI2 - Miami 350 m
- Equinix MI1 - Miami, NOTA 405 m · 69 MW
- NWT Data Center 611 m
- Peer-Point Colocation 1.3 km
- CoreSite - Miami (MI1) 4.2 km · 1.5 MW
- iM Critical Miami 7.7 km
- NocRoom Miami IT Services 12.6 km
- CoreSite - Miami (MI2) 14.2 km
More Lumen Technologies data centers
- Level(3) Weehawken United States
- Level(3) Seattle (Denny Way) United States
- Level(3) Denver United States
- Level(3) London (Braham Street) United Kingdom
- Level(3) McLean United States
- Lumen Ashburn United States
- Level(3) Sunnyvale United States
- Level(3) Dallas United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.