CoreSite - Miami (MI2) is an operational data center operated by CoreSite in Doral, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorCoreSite
Networks4 networks, 2 internet exchanges
PeeringDB.
Address2100 NW 84th Ave
Coordinates25.79332, -80.33358
Websitecoresite.com

Power and grid

Nearest high-voltage substationMilam Substation, 230 kV, 1.6 km away (Florida Power & Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km45
UtilityFlorida Power & Light Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityFPL
Nearest gas pipelineFlorida Gas Trans Co, interstate pipeline, 700 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km7.2 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity436 g CO₂ per kWh (Florida, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6%
Industrial power priceUSD 0.089 per kWh (Florida, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature24.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.2 °C (2001 to 2025)
Cooling degree days2,503 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.83 kWh per m² per day
Wind at 50 m5.4 m/s average
Water stress todayHigh (40-80%) (Florida)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is CoreSite - Miami (MI2) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Milam Substation (230 kV), about 1.6 km away. The local utility is Florida Power & Light Co, in the FPL balancing area.

How clean is the power for CoreSite - Miami (MI2)?

The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.

Who operates CoreSite - Miami (MI2)?

CoreSite.

Data centers near Doral

More CoreSite data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.