QTS Miami (MIA1)
QTS Miami (MIA1) is an operational data center operated by QTS Realty Trust in Miami, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | QTS Realty Trust |
| Networks | 8 networks, 2 internet exchanges PeeringDB. |
| Address | 11234 NW 20th St |
| Coordinates | 25.79154, -80.37960 |
| Website | qtsdatacenters.com/data-centers/miami |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 900 m away (Florida Power & Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 33 |
| Utility | Florida Power & Light Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | FPL |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 5.2 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.2 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 24.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.2 °C (2001 to 2025) |
| Cooling degree days | 2,503 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.83 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is QTS Miami (MIA1) to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 900 m away. The local utility is Florida Power & Light Co, in the FPL balancing area.
How clean is the power for QTS Miami (MIA1)?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates QTS Miami (MIA1)?
QTS Realty Trust.
Data centers near Miami
- EdgeConneX Miami (EDCMIA01) 229 m
- Telefonica KeyCenter 582 m
- Equinix MI6 - Miami, Doral 2.5 km
- CoreSite - Miami (MI2) 4.6 km
- NocRoom Miami IT Services 6.2 km
- CoreSite - Miami (MI1) 15.0 km · 1.5 MW
- NocRoom Miami IT Services 16.7 km
- Equinix MI1 - Miami, NOTA 18.7 km · 69 MW
More QTS Realty Trust data centers
- QTS Atlanta-Metro (ATL1) United States
- QTS Atlanta-Suwanee (SUW1) United States
- QTS Irving - Dallas (DFW1) United States
- QTS Chicago (CHI1) United States
- QTS Atlanta-Fayetteville (ATL2) United States
- QTS Eemshaven (EEM1) Netherlands
- QTS Sacramento (SAC1) United States
- QTS Ashburn (ASH1) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.