Equinix MI6 - Miami, Doral
Equinix MI6 - Miami, Doral is an operational data center operated by Equinix in Doral, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 12 networks, 1 internet exchanges PeeringDB. |
| Address | 1525 NW 98th Ct, Doral |
| Coordinates | 25.78785, -80.35456 |
| Website | equinix.com/locations/americas-colocation/united-states-colocation/miami-data-centers/mi6 |
Power and grid
| Nearest high-voltage substation | Doral Substation, 230 kV, 1.7 km away (Florida Power & Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 43 |
| Utility | Florida Power & Light Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | FPL |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 2.7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 7.2 GW in 13 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 24.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.2 °C (2001 to 2025) |
| Cooling degree days | 2,503 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.83 kWh per m² per day |
| Wind at 50 m | 5.4 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix MI6 - Miami, Doral to the power grid?
The nearest high-voltage substation in OpenStreetMap is Doral Substation (230 kV), about 1.7 km away. The local utility is Florida Power & Light Co, in the FPL balancing area.
How clean is the power for Equinix MI6 - Miami, Doral?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates Equinix MI6 - Miami, Doral?
Equinix.
Data centers near Doral
- CoreSite - Miami (MI2) 2.2 km
- QTS Miami (MIA1) 2.5 km
- Telefonica KeyCenter 2.7 km
- EdgeConneX Miami (EDCMIA01) 2.7 km
- NocRoom Miami IT Services 3.7 km
- CoreSite - Miami (MI1) 12.5 km · 1.5 MW
- Equinix MI1 - Miami, NOTA 16.2 km · 69 MW
- Level(3) Miami (5th St) 16.2 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.