OpenAI Stargate UAE
OpenAI Stargate UAE is a data center under construction operated by G42 in Abu Dhabi, United Arab Emirates. No power figure is public for this site yet. Likely chips: B300.
Power demand is growing at this site
Key facts
| Status | Under construction |
|---|---|
| Operator | G42 |
| Users | OpenAI |
| Project | Stargate |
| Planned power | 1.4 GW by 2028-01-01 Epoch AI timeline projection. |
| AI chips | B300 Reported (Epoch AI or owner data) |
| Investors | Softbank, Oracle, NVIDIA, Cisco, G42 |
| Address | Nexus L&T Project Office, Al Bihouth, Al Dhafrah, Abu Dhabi, United Arab Emirates |
| Coordinates | 23.73369, 53.98059 (city level) |
Build timeline
| Date | Power | H100e | What the satellite images and filings show |
|---|---|---|---|
| 2025-06-09 | 0 | 0 | Land clearing begins for Building 1 and 2 |
| 2025-11-16 | 0 | 0 | Building 1 and 2 are partly constructed. No clear evidence of more buildings starting construction. |
| 2026-12-01 (projected) | 280 MW | 253,000 | Building 1 and 2 are operational. The similar data center in Ajman, UAE was delayed by over a year, now due in December 2026 (compare [1](https://khaznadatacenters.com/press-release/khazna-expands-infrastructure-to-accelerate-uaes-leadership-in-artificial-intelligence/), [2](https://khaznadatacenters.com/press-release/khazna-announces-the-uaes-first-ai-optimized-data-center-and-the-largest-in-its-portfolio-powering-the-nations-drive-toward-ai-leadership/)). The buildings here looked 3-6 months behind the Ajman building as of November 2025, but they were moving faster. So we think Building 1 and 2 are on track for 200 MW by December 2026, along with the Ajman building. |
| 2028-01-01 (projected) | 1.4 GW | 2.0 million | 1 GW of IT power is operational. We haven’t seen expansion beyond 200 MW as of November 2025. Optimistically, 8 more 100 MW buildings start construction in December 2025, in parallel, and take 1.5 years like the first two buildings, hitting 1 GW by Q3 2027. More realistically, there's some staggering of construction over several months, like Stargate Abilene. Our median estimate is January 2028. |
Source: Epoch AI Frontier Data Centers.
Chip deployments
| Date | Chip | Units | Basis |
|---|---|---|---|
| 2026-12-01 | B300 | 100,000 | Estimate |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does OpenAI Stargate UAE use?
Reported chips: B300.
Who operates OpenAI Stargate UAE?
G42. Reported users: OpenAI.
Data centers near Abu Dhabi
- Core42 SuperPOD 31.0 km · 1.8 MW
- Stargate AI DataCenter 66.2 km
- Stargate UAE Abu Dhabi 67.2 km
- Gulf Data Hub ICAD 1 76.5 km · 13 MW
- Amazon Web Services 77.1 km · 19 MW
- G42 Artemis 89.6 km · 1.2 MW
More G42 data centers
- Core42 SuperPOD United Arab Emirates
- G42 Artemis United Arab Emirates
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.