Oracle
Oracle is an operational data center in Hillsboro, United States. Our footprint estimate of its power is about 6.4 MW. Likely chips: NVIDIA GPUs (some AMD Instinct) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 6.4 MW (range 3.2 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,361 m² building outline x 1 floor(s) x 1.2 kW/m². |
| AI chips | NVIDIA GPUs (some AMD Instinct) Guess from the operator, not confirmed. Oracle Cloud sells NVIDIA and AMD GPU capacity. |
| GPU capacity if all AI | about 2,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Northeast 79th Avenue 3380, 97124, Hillsboro |
| Coordinates | 45.54391, -122.89648 |
Power and grid
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 13 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Oracle use?
We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.
What chips does Oracle use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some AMD Instinct).
How clean is the power for Oracle?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Data centers near Hillsboro
- TGN Hillsboro 357 m · 2.6 MW
- Stack Infrastructure Portland PORO2 403 m · 28 MW
- Digital Realty Portland - PDX10 538 m · 8.9 MW
- Flexential - Portland/Hillsboro (PDX01) 639 m · 6.8 MW
- EdgeConneX Portland (EDCPOR01) 985 m
- Verizon Hillsboro (Tanasbourne) Data Center 1.1 km · 8.8 MW
- EdgeConneX - Portland POR03 1.9 km · 8.4 MW
- Flexential - Portland/Hillsboro 2 (PDX02) 2.2 km · 24 MW