Data Center Directory

Oracle

Oracle is an operational data center in Hillsboro, United States. Our footprint estimate of its power is about 6.4 MW. Likely chips: NVIDIA GPUs (some AMD Instinct) (guess).

Key facts

StatusOperational
Facility power6.4 MW (range 3.2 MW to 10 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,361 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (some AMD Instinct)
Guess from the operator, not confirmed. Oracle Cloud sells NVIDIA and AMD GPU capacity.
GPU capacity if all AIabout 2,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNortheast 79th Avenue 3380, 97124, Hillsboro
Coordinates45.54391, -122.89648

Power and grid

UtilityPortland General Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPGE
Nearest gas pipelineNorthwest Pipeline, interstate pipeline, 13 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity200 g CO₂ per kWh (Oregon, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2%
Industrial power priceUSD 0.087 per kWh (Oregon, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature10 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.3 °C (2001 to 2025)
Cooling degree days79 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow - Medium (10-20%) (Oregon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Oracle use?

We estimate the facility power at about 6.4 MW. Estimate from building footprint, low confidence.

What chips does Oracle use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some AMD Instinct).

How clean is the power for Oracle?

The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.

Data centers near Hillsboro

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.