Digital Realty Portland - PDX10
Digital Realty Portland - PDX10 is an operational data center operated by Digital Realty in Hillsboro, United States. Our footprint estimate of its power is about 8.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 8.9 MW (range 4.5 MW to 14 MW) Estimate from building footprint, low confidence. Footprint estimate: about 7,454 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 6 networks, 1 internet exchanges PeeringDB. |
| Also known as | Digital Realty PDX10 Data Center |
| Address | 3825 NE Aloclek Dr |
| Coordinates | 45.54761, -122.89202 |
| Website | digitalrealty.com |
Power and grid
| Nearest high-voltage substation | Keeler Substation, 500 kV, 400 m away (Bonneville Power Administration) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 12 |
| Utility | Portland General Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PGE |
| Nearest gas pipeline | Northwest Pipeline, interstate pipeline, 12.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 832 MW in 39 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 200 g CO₂ per kWh (Oregon, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2% |
| Industrial power price | USD 0.087 per kWh (Oregon, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.3 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low - Medium (10-20%) (Oregon) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Realty Portland - PDX10 use?
We estimate the facility power at about 8.9 MW. Estimate from building footprint, low confidence.
How close is Digital Realty Portland - PDX10 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Keeler Substation (500 kV), about 400 m away. The local utility is Portland General Electric Co, in the PGE balancing area.
How clean is the power for Digital Realty Portland - PDX10?
The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.
Who operates Digital Realty Portland - PDX10?
Digital Realty.
Data centers near Hillsboro
- Flexential - Portland/Hillsboro (PDX01) 104 m · 6.8 MW
- TGN Hillsboro 184 m · 2.6 MW
- Stack Infrastructure Portland PORO2 459 m · 28 MW
- Oracle 538 m · 6.4 MW
- Verizon Hillsboro (Tanasbourne) Data Center 824 m · 8.8 MW
- EdgeConneX Portland (EDCPOR01) 1.2 km
- EdgeConneX - Portland POR03 1.9 km · 8.4 MW
- SMRWORXA - Somerset West Central Office 2.0 km
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.