PIX Century Telecom - Belo Horizonte
PIX Century Telecom - Belo Horizonte is an operational data center operated by CENTURY TELECOM in Contagem, Brazil. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | CENTURY TELECOM |
| Networks | 6 networks, 1 internet exchanges PeeringDB. |
| Address | Rua José Perminio da Silva, 80 Galpão 7, Cinco |
| Coordinates | -19.93173, -44.06224 |
| Website | century.net.br |
Power and grid
| Nearest high-voltage substation | Subestação Cinco, 138 kV, 800 m away (Cemig) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Subestação Barreiro, 345 kV, 10.6 km away |
| HV substations within 10 km | 9 |
| Grid carbon intensity | 109 g CO₂ per kWh (Brazil, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.1%, wind 15.2%, solar 11.5%, bioenergy 8.1%, gas 7.8%. Clean power: 88.9% |
Climate and water
| Average temperature | 20.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 37.7 °C (2001 to 2025) |
| Cooling degree days | 1,000 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.02 kWh per m² per day |
| Wind at 50 m | 4.9 m/s average |
| Water stress today | Low (<10%) (Minas Gerais) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is PIX Century Telecom - Belo Horizonte to the power grid?
The nearest high-voltage substation in OpenStreetMap is Subestação Cinco (138 kV), about 800 m away.
How clean is the power for PIX Century Telecom - Belo Horizonte?
The grid in Brazil emits about 109 g CO₂ per kWh (2025). Largest sources: hydro 52.1%, wind 15.2%, solar 11.5%.
Who operates PIX Century Telecom - Belo Horizonte?
CENTURY TELECOM.
Data centers near Contagem
- PIX Sempre (Brasil TecPar) 4.0 km
- Data Center (Ministério Público de Minas Gerais) 8.7 km · 0.9 MW
- Eletronet - Belo Horizonte 10.4 km
- PoP-MG 12.3 km
- PIX Prodabel 13.1 km
- G8 Teleporto Serra do Curral Belo Horizonte 13.5 km
- MASTER DA WEB 14.5 km
- PIX Vogel Telecom BH 14.5 km
More CENTURY TELECOM data centers
- CENTURY TELECOM LTDA Brazil