Quasar Data Center
Quasar Data Center is an operational data center operated by Quasar Data Center in Houston, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Quasar Data Center |
| Networks | 7 networks PeeringDB. |
| Address | 1001 Texas Ave |
| Coordinates | 29.76006, -95.36210 |
| Website | quasardata.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 138 kV, 900 m away (CenterPoint Energy) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 345 kV, 9.3 km away |
| HV substations within 10 km | 33 |
| Utility | San Bernard Electric Coop, INC (cooperative) Electric retail service territory (HIFLD, US government). |
| Balancing authority | ERCO |
| Nearest gas pipeline | Kinder Morgan Texas Pipeline Co, intrastate pipeline, 7 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 21 GW in 54 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 379 g CO₂ per kWh (Texas, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 48.3%, wind 21.7%, coal 11.6%, solar 10.7%, nuclear 7%. Clean power: 39.8% |
| Industrial power price | USD 0.072 per kWh (Texas, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 20.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 42.7 °C (2001 to 2025) |
| Cooling degree days | 1,754 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.65 kWh per m² per day |
| Wind at 50 m | 5.3 m/s average |
| Water stress today | High (40-80%) (Texas) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Quasar Data Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 900 m away. The local utility is San Bernard Electric Coop, INC, in the ERCO balancing area.
How clean is the power for Quasar Data Center?
The grid in Texas emits about 379 g CO₂ per kWh (2025). Largest sources: gas 48.3%, wind 21.7%, coal 11.6%.
Who operates Quasar Data Center?
Quasar Data Center.
Data centers near Houston
- Alpheus Houston (777 Walker Street) 411 m
- Netrality Houston - 1301 Fannin 841 m
- InterConnX Realty 964 m
- 3500 Garrott 3.1 km
- Databank Houston Galleria (HOU5) 8.8 km
- Data Foundry Houston 1 10.7 km
- Rice Data Center 13.8 km · 5 MW
- Equinix HO1 - Houston 19.5 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.