Recursion BioHive-2 is an operational AI data center operated by Recursion Pharmaceuticals in Salt Lake City, United States. Its power is about 0.7 MW. Epoch AI estimates about 504 H100-equivalent AI chips (NVIDIA A100, NVIDIA H100 SXM5 80GB).

Key facts

StatusOperational
OperatorRecursion Pharmaceuticals
Facility power0.7 MW
Reported (Epoch AI or owner data)
AI compute504 H100-equivalents
AI chipsNVIDIA A100, NVIDIA H100 SXM5 80GB
Reported (Epoch AI or owner data)
Chip count504
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 310 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Address41 400 W, Salt Lake City, UT 84101
Coordinates40.76768, -111.90264

Power and grid

Nearest high-voltage substationUnnamed substation, 138 kV, 200 m away (Rocky Mountain Power)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationMid-Valley Substation, 345 kV, 7.1 km away
HV substations within 10 km27
UtilityPacificorp (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPACW, PACE
Nearest gas pipelineKern River Gas Trans Co, interstate pipeline, 9.2 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km1.1 GW in 16 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity200 g CO₂ per kWh (Oregon, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 44.6%, gas 33.9%, wind 14.5%, solar 5.2%, bioenergy 1.6%. Clean power: 66.2%
Industrial power priceUSD 0.087 per kWh (Oregon, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature8.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.9 °C (2001 to 2025)
Cooling degree days365 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.78 kWh per m² per day
Wind at 50 m3.6 m/s average
Water stress todayLow - Medium (10-20%) (Oregon)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
Recursion BioHive-1NVIDIA A1003200.3 MW2021-04-15
Recursion BioHive-2NVIDIA H100 SXM5 80GB5040.7 MW2024-05-13

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does Recursion BioHive-2 use?

Public data puts the facility power at about 0.7 MW. Reported (Epoch AI or owner data).

What chips does Recursion BioHive-2 use?

Reported chips: NVIDIA A100, NVIDIA H100 SXM5 80GB.

How close is Recursion BioHive-2 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (138 kV), about 200 m away. The local utility is Pacificorp, in the PACW, PACE balancing area.

How clean is the power for Recursion BioHive-2?

The grid in Oregon emits about 200 g CO₂ per kWh (2025). Largest sources: hydro 44.6%, gas 33.9%, wind 14.5%.

Who operates Recursion BioHive-2?

Recursion Pharmaceuticals.

Data centers near Salt Lake City

Sources

Correct this page or get the data