T-Mobile Everglades MSO Data Center

T-Mobile Everglades MSO Data Center is an operational data center in Sunrise, United States. Our footprint estimate of its power is about 4.9 MW.

Key facts

StatusOperational
Facility power4.9 MW (range 2.4 MW to 7.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,076 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,100 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressNorthwest 103rd Avenue 4850, 33351, Sunrise
Coordinates26.18499, -80.28688

Power and grid

Nearest high-voltage substationConservation Substation FPL, 500 kV, 1.6 km away (Florida Power & Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km14
UtilityFlorida Power & Light Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityFPL
Nearest gas pipelineFlorida Gas Trans Co, interstate pipeline, 10 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.1 GW in 8 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity436 g CO₂ per kWh (Florida, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6%
Industrial power priceUSD 0.089 per kWh (Florida, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature24.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.2 °C (2001 to 2025)
Cooling degree days2,503 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.83 kWh per m² per day
Wind at 50 m5.4 m/s average
Water stress todayHigh (40-80%) (Florida)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does T-Mobile Everglades MSO Data Center use?

We estimate the facility power at about 4.9 MW. Estimate from building footprint, low confidence.

How close is T-Mobile Everglades MSO Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is Conservation Substation FPL (500 kV), about 1.6 km away. The local utility is Florida Power & Light Co, in the FPL balancing area.

How clean is the power for T-Mobile Everglades MSO Data Center?

The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.