Data Center Directory

EdgeConneX Miami (EDCMIA02)

EdgeConneX Miami (EDCMIA02) is an operational data center operated by EdgeConneX in Miami, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorEdgeConneX
Networks4 networks
PeeringDB.
Address475 NE 185th St
Coordinates25.94552, -80.19139
Websiteedgeconnex.com

Power and grid

Nearest high-voltage substationWeston Village Substation, 138 kV, 1.4 km away (Florida Power & Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationGreynolds Substation, 230 kV, 4.5 km away
HV substations within 10 km29
UtilityFlorida Power & Light Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityFPL
Nearest gas pipelineFlorida Gas Trans Co, interstate pipeline, 400 m away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.2 GW in 11 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity436 g CO₂ per kWh (Florida, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6%
Industrial power priceUSD 0.089 per kWh (Florida, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature25.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.9 °C (2001 to 2025)
Cooling degree days2,641 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy5.11 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayHigh (40-80%) (Florida)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050High (40-80%)
Business-as-usual scenario.

Satellite view

Questions

How close is EdgeConneX Miami (EDCMIA02) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Weston Village Substation (138 kV), about 1.4 km away. The local utility is Florida Power & Light Co, in the FPL balancing area.

How clean is the power for EdgeConneX Miami (EDCMIA02)?

The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.

Who operates EdgeConneX Miami (EDCMIA02)?

EdgeConneX.