Flexential - Fort Lauderdale (FLL1/2)
Flexential - Fort Lauderdale (FLL1/2) is an operational data center operated by Flexential in Fort Lauderdale, United States. Our footprint estimate of its power is about 6.5 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Flexential |
| Facility power | 6.5 MW (range 3.2 MW to 10 MW) Estimate from building footprint, low confidence. Footprint estimate: about 5,392 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,800 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 1 networks PeeringDB. |
| Also known as | Flexential Fort Lauderdale |
| Address | 5301 NW 33rd Ave |
| Coordinates | 26.19026, -80.19326 |
| Website | flexential.com |
Power and grid
| Nearest high-voltage substation | Palm Aire Substation, 138 kV, 1.3 km away (Florida Power & Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Woodlands Substation FPL, 230 kV, 3.2 km away |
| HV substations within 10 km | 31 |
| Utility | Florida Power & Light Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | FPL |
| Nearest gas pipeline | Florida Gas Trans Co, interstate pipeline, 2.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.2 GW in 10 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 436 g CO₂ per kWh (Florida, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 71.7%, nuclear 11.2%, solar 11.1%, coal 3.7%, bioenergy 1.2%. Clean power: 23.6% |
| Industrial power price | USD 0.089 per kWh (Florida, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 25.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.9 °C (2001 to 2025) |
| Cooling degree days | 2,641 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.11 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | High (40-80%) (Florida) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | High (40-80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Flexential - Fort Lauderdale (FLL1/2) use?
We estimate the facility power at about 6.5 MW. Estimate from building footprint, low confidence.
How close is Flexential - Fort Lauderdale (FLL1/2) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Palm Aire Substation (138 kV), about 1.3 km away. The local utility is Florida Power & Light Co, in the FPL balancing area.
How clean is the power for Flexential - Fort Lauderdale (FLL1/2)?
The grid in Florida emits about 436 g CO₂ per kWh (2025). Largest sources: gas 71.7%, nuclear 11.2%, solar 11.1%.
Who operates Flexential - Fort Lauderdale (FLL1/2)?
Flexential.
Data centers near Fort Lauderdale
- 365 Data Centers Ft. Lauderdale (FLL) 637 m
- T-Mobile Everglades MSO Data Center 9.4 km · 4.9 MW
- 500 Green (AKA VOLICO 2.0) 12.7 km
- Globenet Boca Raton CLS 20.1 km
- Equinix MI3 - Miami, Boca Raton 23.6 km
- Cogent Boca Raton 24.0 km
- Telxius Boca Raton DC 25.2 km
- EdgeConneX Miami (EDCMIA02) 27.2 km
More Flexential data centers
- Douglasville 2 United States
- Flexential - Atlanta/Douglasville (ATL5) United States
- Flexential - Portland/Hillsboro 3 (PDX03) United States
- Flexential - Dallas/Plano (DFW01) United States
- Flexential - Denver/Englewood (DEN11) United States
- Flexential - Portland/Hillsboro 2 (PDX02) United States
- Flexential Dallas - Richardson United States
- Flexential - Portland/Hillsboro 4 (PDX04) United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.