Data Center Directory

TM ONE IPDC, Johore

TM ONE IPDC, Johore is an operational data center operated by Telekom Malaysia Berhad (TM) in Iskandar Puteri, Malaysia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorTelekom Malaysia Berhad (TM)
Networks7 networks, 1 internet exchanges
PeeringDB.
AddressIskandar Puteri Core Data Centre
Coordinates1.43527, 103.59868
Websitetmone.com.my

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 275 kV, 10.5 km away
HV substations within 10 km1
Power plants within 50 km16 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.9 °C (2001 to 2025)
Cooling degree days3,296 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.59 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow (<10%) (Johor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is TM ONE IPDC, Johore to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 9 km away.

How clean is the power for TM ONE IPDC, Johore?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.

Who operates TM ONE IPDC, Johore?

Telekom Malaysia Berhad (TM).

Data centers near Iskandar Puteri

More Telekom Malaysia Berhad (TM) data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.