Equinix JH1 - Johor
Equinix JH1 - Johor is an operational data center operated by Equinix in Iskandar Puteri, Malaysia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Networks | 18 networks, 1 internet exchanges PeeringDB. |
| Address | No.2 & 6, Jalan Teknologi Perintis, 1/3, Taman Teknologi, Nusajaya |
| Coordinates | 1.43216, 103.59901 |
| Website | equinix.com/data-centers/asia-pacific-colocation/malaysia-colocation/johor-data-center |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 8.7 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 10.7 km away |
| HV substations within 10 km | 1 |
| Power plants within 50 km | 16 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.9 °C (2001 to 2025) |
| Cooling degree days | 3,296 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.59 kWh per m² per day |
| Wind at 50 m | 4 m/s average |
| Water stress today | Low (<10%) (Johor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Equinix JH1 - Johor to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 8.7 km away.
How clean is the power for Equinix JH1 - Johor?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Who operates Equinix JH1 - Johor?
Equinix.
Data centers near Iskandar Puteri
- TM ONE IPDC, Johore 348 m
- STTGDC JHB1 1.9 km
- DayOne Nusajaya 2.8 km · 662 MW
- Gp3 Data Center 6.2 km
- Data center in Jurong West 13.8 km
- Nxera data center in Boon Lay 13.9 km · 2.2 MW
- Google Jurong West Data Center 15.2 km · 8.8 MW
- DayOne Kempas 15.9 km · 590 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.