Data Center Directory

STTGDC JHB1

STTGDC JHB1 is an operational data center operated by STTGDC in Gelang Patah, Malaysia. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorSTTGDC
AddressNusa Cemerlang Industrial Park, Nusa Cemerlang Industrial Park
Coordinates1.44372, 103.61179
Websitesttgdc.com

Power and grid

Nearest high-voltage substationUnnamed substation, 275 kV, 8.7 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km1
Power plants within 50 km16 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.9 °C (2001 to 2025)
Cooling degree days3,296 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.59 kWh per m² per day
Wind at 50 m4 m/s average
Water stress todayLow (<10%) (Johor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How close is STTGDC JHB1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (275 kV), about 8.7 km away.

How clean is the power for STTGDC JHB1?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.

Who operates STTGDC JHB1?

STTGDC.

Data centers near Gelang Patah

More STTGDC data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.