Adam
Adam is an operational data center in Cerdanyola del Vallès, Spain. Our footprint estimate of its power is about 3 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 3 MW (range 1.5 MW to 4.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,535 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Carrer dels Artesans 7, 08290, Cerdanyola del Vallès |
| Coordinates | 41.48968, 2.12326 |
Power and grid
| Nearest high-voltage substation | SET Cerdanyola, 110 kV, 1.6 km away (Endesa) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Codonyers, 220 kV, 2.4 km away |
| HV substations within 10 km | 30 |
| Power plants within 50 km | 2.5 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 687 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.38 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Adam use?
We estimate the facility power at about 3 MW. Estimate from building footprint, low confidence.
How close is Adam to the power grid?
The nearest high-voltage substation in OpenStreetMap is SET Cerdanyola (110 kV), about 1.6 km away.
How clean is the power for Adam?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Data centers near Cerdanyola del Vallès
- Adam - PTV 641 m
- Centre de Processament de Dades IBM 1.3 km · 11 MW
- EXA Edge DC Barcelona 1.6 km
- Data center in Sant Cugat del Vallès 1.6 km · 7.9 MW
- Adam - BCN 9.8 km
- Mare Nostrum 5 11.1 km · 6 MW
- Digital Realty BCN1 - Barcelona 11.3 km
- Barcelona Cable Landing Station 11.3 km
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.