Centre de Processament de Dades IBM
Centre de Processament de Dades IBM is an operational data center in Sant Cugat del Vallès, Spain. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 11 MW (range 5.7 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,440 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 41.48982, 2.10807 |
Power and grid
| Nearest high-voltage substation | Codonyers, 220 kV, 1.5 km away (Red Eléctrica de España) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 25 |
| Power plants within 50 km | 2.5 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 154 g CO₂ per kWh (Spain, 2025) Average of all power made in the area. Ember. |
| Grid power mix | solar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6% |
| Industrial power price | EUR 0.105 per kWh (Spain, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.2 °C (2001 to 2025) |
| Cooling degree days | 687 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.38 kWh per m² per day |
| Wind at 50 m | 4.3 m/s average |
| Water stress today | High (40-80%) (Spain) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Centre de Processament de Dades IBM use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is Centre de Processament de Dades IBM to the power grid?
The nearest high-voltage substation in OpenStreetMap is Codonyers (220 kV), about 1.5 km away.
How clean is the power for Centre de Processament de Dades IBM?
The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.
Data centers near Sant Cugat del Vallès
- Data center in Sant Cugat del Vallès 707 m · 7.9 MW
- Adam 1.3 km · 3 MW
- Adam - PTV 1.7 km
- EXA Edge DC Barcelona 2.6 km
- Adam - BCN 10.4 km
- Mare Nostrum 5 11.1 km · 6 MW
- CSUC Campus Nord 11.4 km
- Digital Realty BCN1 - Barcelona 12.4 km
Sources
Correct this page or get the data