Centre de Processament de Dades IBM

Centre de Processament de Dades IBM is an operational data center in Sant Cugat del Vallès, Spain. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
Facility power11 MW (range 5.7 MW to 18 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 9,440 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates41.48982, 2.10807

Power and grid

Nearest high-voltage substationCodonyers, 220 kV, 1.5 km away (Red Eléctrica de España)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km25
Power plants within 50 km2.5 GW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity154 g CO₂ per kWh (Spain, 2025)
Average of all power made in the area. Ember.
Grid power mixsolar 21.9%, gas 21.5%, wind 20.4%, nuclear 18.8%, hydro 11.4%. Clean power: 74.6%
Industrial power priceEUR 0.105 per kWh (Spain, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature15.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.2 °C (2001 to 2025)
Cooling degree days687 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.38 kWh per m² per day
Wind at 50 m4.3 m/s average
Water stress todayHigh (40-80%) (Spain)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Extremely High (>80%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Centre de Processament de Dades IBM use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How close is Centre de Processament de Dades IBM to the power grid?

The nearest high-voltage substation in OpenStreetMap is Codonyers (220 kV), about 1.5 km away.

How clean is the power for Centre de Processament de Dades IBM?

The grid in Spain emits about 154 g CO₂ per kWh (2025). Largest sources: solar 21.9%, gas 21.5%, wind 20.4%.