AIMS
AIMS is a data center under construction in Cyberjaya, Malaysia. Our footprint estimate of its power is about 2.2 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 2.2 MW (range 0.9 MW to 5.5 MW) Estimate from building footprint, low confidence. Footprint estimate: about 18,410 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 940 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 2.93775, 101.65736 |
| Website | aims.com.my |
Power and grid
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 3,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Selangor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does AIMS use?
We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.
How clean is the power for AIMS?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Data centers near Cyberjaya
- MEASAT DC Cyberjaya 268 m
- TMONE Klang Valley Data Center 580 m · 5.4 MW
- TM ONE CBJ1, Cyberjaya 821 m
- CX2 / MY01 Cyberjaya Malaysia 2.3 km
- CX5 / MY02 Cyberjaya Malaysia 2.7 km · 4.5 MW
- CSF CX1 / TelcoHub1 Kuala Lumpur 2.7 km
- Bridge Data Centres - MY02-C2 3.1 km · 13 MW
- Pi DC Datacenter 3.5 km · 3.5 MW
Sources
Correct this page or get the data