Data Center Directory

AIMS

AIMS is a data center under construction in Cyberjaya, Malaysia. Our footprint estimate of its power is about 2.2 MW.

Key facts

StatusUnder construction
Facility power2.2 MW (range 0.9 MW to 5.5 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 18,410 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 940 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates2.93775, 101.65736
Websiteaims.com.my

Power and grid

Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.2 °C (2001 to 2025)
Cooling degree days3,495 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.8 kWh per m² per day
Wind at 50 m3.1 m/s average
Water stress todayLow (<10%) (Selangor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does AIMS use?

We estimate the facility power at about 2.2 MW. Estimate from building footprint, low confidence.

How clean is the power for AIMS?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.

Data centers near Cyberjaya

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.