MEASAT DC Cyberjaya
MEASAT DC Cyberjaya is an operational data center operated by MEASAT Satellite Systems in Cyberjaya, Malaysia. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | MEASAT Satellite Systems |
| Address | Measat Teleport Broadcast Center, Jalan Teknokrat 1/2 |
| Coordinates | 2.93556, 101.65836 |
| Website | measat.com |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 2.3 km away (Tenaga Nasional) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | PMU GIS Cybersouth 4, 275 kV, 3.7 km away |
| HV substations within 10 km | 10 |
| Power plants within 50 km | 10 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 601 g CO₂ per kWh (Malaysia, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21% |
Climate and water
| Average temperature | 27.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 3,495 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.8 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Selangor) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is MEASAT DC Cyberjaya to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 2.3 km away.
How clean is the power for MEASAT DC Cyberjaya?
The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.
Who operates MEASAT DC Cyberjaya?
MEASAT Satellite Systems.
Data centers near Cyberjaya
- AIMS 268 m · 2.2 MW
- TMONE Klang Valley Data Center 356 m · 5.4 MW
- TM ONE CBJ1, Cyberjaya 600 m
- CX2 / MY01 Cyberjaya Malaysia 2.1 km
- CSF CX1 / TelcoHub1 Kuala Lumpur 2.5 km
- CX5 / MY02 Cyberjaya Malaysia 2.5 km · 4.5 MW
- Bridge Data Centres - MY02-C2 2.9 km · 13 MW
- Pi DC Datacenter 3.3 km · 3.5 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.