Data Center Directory

TMONE Klang Valley Data Center

TMONE Klang Valley Data Center is an operational data center in Cyberjaya, Malaysia. Our footprint estimate of its power is about 5.4 MW.

Key facts

StatusOperational
Facility power5.4 MW (range 2.2 MW to 14 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 45,368 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 2,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates2.93253, 101.65732

Power and grid

Nearest high-voltage substationPMU 132/33kV Cyberjaya Central GIS (CBJC), 132 kV, 2.2 km away (Tenaga Nasional)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationPMU GIS Cybersouth 4, 275 kV, 3.4 km away
HV substations within 10 km10
Power plants within 50 km10 GW in 12 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity601 g CO₂ per kWh (Malaysia, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 44.5%, gas 33.2%, hydro 16.3%, solar 3.9%, oil and other fossil 1.3%. Clean power: 21%

Climate and water

Average temperature27.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.2 °C (2001 to 2025)
Cooling degree days3,495 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.8 kWh per m² per day
Wind at 50 m3.1 m/s average
Water stress todayLow (<10%) (Selangor)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does TMONE Klang Valley Data Center use?

We estimate the facility power at about 5.4 MW. Estimate from building footprint, low confidence.

How close is TMONE Klang Valley Data Center to the power grid?

The nearest high-voltage substation in OpenStreetMap is PMU 132/33kV Cyberjaya Central GIS (CBJC) (132 kV), about 2.2 km away.

How clean is the power for TMONE Klang Valley Data Center?

The grid in Malaysia emits about 601 g CO₂ per kWh (2025). Largest sources: coal 44.5%, gas 33.2%, hydro 16.3%.

Data centers near Cyberjaya

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.