Aligned Data Centers
Aligned Data Centers is a data center under construction in El Mirage, United States. Our footprint estimate of its power is about 43 MW.
Key facts
| Status | Under construction |
|---|---|
| Facility power | 43 MW (range 17 MW to 109 MW) Estimate from building footprint, low confidence. Footprint estimate: about 362,017 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 18,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.56401, -112.38684 |
Power and grid
| Utility | Tonopah Irrigation District Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | AZPS |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 8.4 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 49.4 °C (2001 to 2025) |
| Cooling degree days | 2,422 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.85 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Aligned Data Centers use?
We estimate the facility power at about 43 MW. Estimate from building footprint, low confidence.
How clean is the power for Aligned Data Centers?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Data centers near El Mirage
- Compass PHX II 5.5 km · 55 MW
- Microsoft Goodyear Campus 9.5 km · 81 MW
- Vantage Data Centers AZ1 Campus 13.0 km · 17 MW
- Compass Datacenters Goodyear Campus 13.6 km · 84 MW
- Data center in Goodyear 13.9 km · 35 MW
- Stream Phoenix 16.3 km · 77 MW
- Stack Infrastructure PHX01 Campus 16.6 km · 26 MW
- Stream Data Centers PHXA Campus 16.7 km · 47 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.