Microsoft Goodyear Campus
Microsoft Goodyear Campus is an operational data center in Litchfield Park, United States. Our footprint estimate of its power is about 81 MW. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Facility power | 81 MW (range 32 MW to 202 MW) Estimate from building footprint, low confidence. Footprint estimate: about 674,827 m² site outline x 0.12 kW per m² of land. |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| GPU capacity if all AI | about 35,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 33.48990, -112.43799 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 230 kV, 500 m away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 2 |
| Utility | Tonopah Irrigation District Electric retail service territory (HIFLD, US government). |
| Balancing authority | AZPS |
| Nearest gas pipeline | El Paso Natural Gas Co, interstate pipeline, 9.6 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 14 GW in 43 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 311 g CO₂ per kWh (Arizona, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 43%, nuclear 25.6%, solar 17.5%, coal 7.5%, hydro 4.1%. Clean power: 49.8% |
| Industrial power price | USD 0.097 per kWh (Arizona, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 22.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 49.4 °C (2001 to 2025) |
| Cooling degree days | 2,422 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 5.85 kWh per m² per day |
| Wind at 50 m | 4.6 m/s average |
| Water stress today | Extremely High (>80%) (Arizona) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Microsoft Goodyear Campus use?
We estimate the facility power at about 81 MW. Estimate from building footprint, low confidence.
What chips does Microsoft Goodyear Campus use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Goodyear Campus to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 500 m away. The local utility is Tonopah Irrigation District, in the AZPS balancing area.
How clean is the power for Microsoft Goodyear Campus?
The grid in Arizona emits about 311 g CO₂ per kWh (2025). Largest sources: gas 43%, nuclear 25.6%, solar 17.5%.
Data centers near Litchfield Park
- Compass Datacenters Goodyear Campus 7.6 km · 84 MW
- Vantage Data Centers AZ1 Campus 7.7 km · 17 MW
- Data center in Goodyear 8.0 km · 35 MW
- Aligned Data Centers 9.5 km · 43 MW
- Stream Phoenix 10.7 km · 77 MW
- Microsoft Goodyear Airpark Campus 10.8 km · 111 MW
- Stream Data Centers PHXA Campus 11.0 km · 47 MW
- PHX-13 11.0 km · 21 MW
Sources