Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5
Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 is an operational data center operated by Ark Data Centres in Corsham, United Kingdom. Our footprint estimate of its power is about 10 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Ark Data Centres |
| Facility power | 10 MW (range 5.1 MW to 16 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,510 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 7 networks PeeringDB. |
| Also known as | Ark Data Centres |
| Address | Westwells Road, Spring Park, Hawthorn |
| Coordinates | 51.41969, -2.21592 |
| Website | arkdatacentres.co.uk |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 275 kV, 5.1 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 3.4 GW in 146 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.7 °C (2001 to 2025) |
| Cooling degree days | 33 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 use?
We estimate the facility power at about 10 MW. Estimate from building footprint, low confidence.
How close is Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (275 kV), about 5.1 km away.
How clean is the power for Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Ark Data Centres - Spring Park - SQ17, P1, P2, P3, P4, P5?
Ark Data Centres.
Data centers near Corsham
- Data center in Neston 352 m · 3 MW
- Ark Data Centres 513 m · 6.2 MW
- nLighten Bristol BRS1 28.5 km
- nLighten Bristol 28.7 km · 7.4 MW
- Vodafone 29.4 km · 8.5 MW
- Nationwide Building Society data center in Swindon 31.3 km · 4 MW
- AWS Swindon Data Centre 33.4 km · 14 MW
- nLighten Swindon BRS2 39.3 km · 8 MW
More Ark Data Centres data centers
- Ark Data Centres data center in Fleet United Kingdom
- Ark Data Centres Meridian Park United Kingdom
- Ark Data Centres - Longcross Park United Kingdom
- Ark Data Centres United Kingdom
Sources
Correct this page or get the data